# Docker Release Process
|
||||
|
||||
This document describes how the Docker project is released. The Docker project
|
||||
release process targets the Engine, Compose, Kitematic, Machine, Swarm,
|
||||
Distribution, Notary and their underlying dependencies (libnetwork, libkv,
|
||||
etc...).
|
||||
|
||||
Step-by-step technical details of the process are described in
|
||||
[RELEASE-CHECKLIST.md](https://github.com/docker/docker/blob/master/project/RELEASE-CHECKLIST.md).
|
||||
|
||||
## Release cycle
|
||||
|
||||
The Docker project follows a **time-based release cycle** and ships every nine
|
||||
weeks. A release cycle starts the same day the previous release cycle ends.
|
||||
|
||||
The first six weeks of the cycle are dedicated to development and review. During
|
||||
this phase, new features and bugfixes submitted to any of the projects are
|
||||
**eligible** to be shipped as part of the next release. No changeset submitted
|
||||
during this period is however guaranteed to be merged for the current release
|
||||
cycle.
|
||||
|
||||
## The freeze period
|
||||
|
||||
Six weeks after the beginning of the cycle, the codebase is officially frozen
|
||||
and the codebase reaches a state close to the final release. A Release Candidate
|
||||
(RC) gets created at the same time. The freeze period is used to find bugs and
|
||||
get feedback on the state of the RC before the release.
|
||||
|
||||
During this freeze period, while the `master` branch will continue its normal
|
||||
development cycle, no new features are accepted into the RC. As bugs are fixed
|
||||
in `master` the release owner will selectively 'cherry-pick' critical ones to
|
||||
be included into the RC. As the RC changes, new ones are made available for the
|
||||
community to test and review.
|
||||
|
||||
This period lasts for three weeks.
|
||||
|
||||
## How to maximize chances of being merged before the freeze date?
|
||||
|
||||
First of all, there is never a guarantee that a specific changeset is going to
|
||||
be merged. However there are different actions to follow to maximize the chances
|
||||
for a changeset to be merged:
|
||||
|
||||
- The team gives priority to review the PRs aligned with the Roadmap (usually
|
||||
defined by a ROADMAP.md file at the root of the repository).
|
||||
- The earlier a PR is opened, the more time the maintainers have to review. For
|
||||
example, if a PR is opened the day before the freeze date, it’s very unlikely
|
||||
that it will be merged for the release.
|
||||
- Constant communication with the maintainers (mailing-list, IRC, Github issues,
|
||||
etc.) allows to get early feedback on the design before getting into the
|
||||
implementation, which usually reduces the time needed to discuss a changeset.
|
||||
- If the code is commented, fully tested and by extension follows every single
|
||||
rules defined by the [CONTRIBUTING guide](
|
||||
https://github.com/docker/docker/blob/master/CONTRIBUTING.md), this will help
|
||||
the maintainers by speeding up the review.
|
||||
|
||||
## The release
|
||||
|
||||
At the end of the freeze (nine weeks after the start of the cycle), all the
|
||||
projects are released together.
|
||||
|
||||
```
|
||||
Codebase Release
|
||||
Start of is frozen (end of the
|
||||
the Cycle (7th week) 9th week)
|
||||
+---------------------------------------+---------------------+
|
||||
| | |
|
||||
| Development phase | Freeze phase |
|
||||
| | |
|
||||
+---------------------------------------+---------------------+
|
||||
6 weeks 3 weeks
|
||||
<---------------------------------------><-------------------->
|
||||
```
|
||||
|
||||
## Exceptions
|
||||
|
||||
If a critical issue is found at the end of the freeze period and more time is
|
||||
needed to address it, the release will be pushed back. When a release gets
|
||||
pushed back, the next release cycle gets delayed as well.
|