# Docker Release Process
|
||||||
|
|
||||||
|
This document describes how the Docker project is released. The Docker project
|
||||||
|
release process targets the Engine, Compose, Kitematic, Machine, Swarm,
|
||||||
|
Distribution, Notary and their underlying dependencies (libnetwork, libkv,
|
||||||
|
etc...).
|
||||||
|
|
||||||
|
Step-by-step technical details of the process are described in
|
||||||
|
[RELEASE-CHECKLIST.md](https://github.com/docker/docker/blob/master/project/RELEASE-CHECKLIST.md).
|
||||||
|
|
||||||
|
## Release cycle
|
||||||
|
|
||||||
|
The Docker project follows a **time-based release cycle** and ships every nine
|
||||||
|
weeks. A release cycle starts the same day the previous release cycle ends.
|
||||||
|
|
||||||
|
The first six weeks of the cycle are dedicated to development and review. During
|
||||||
|
this phase, new features and bugfixes submitted to any of the projects are
|
||||||
|
**eligible** to be shipped as part of the next release. No changeset submitted
|
||||||
|
during this period is however guaranteed to be merged for the current release
|
||||||
|
cycle.
|
||||||
|
|
||||||
|
## The freeze period
|
||||||
|
|
||||||
|
Six weeks after the beginning of the cycle, the codebase is officially frozen
|
||||||
|
and the codebase reaches a state close to the final release. A Release Candidate
|
||||||
|
(RC) gets created at the same time. The freeze period is used to find bugs and
|
||||||
|
get feedback on the state of the RC before the release.
|
||||||
|
|
||||||
|
During this freeze period, while the `master` branch will continue its normal
|
||||||
|
development cycle, no new features are accepted into the RC. As bugs are fixed
|
||||||
|
in `master` the release owner will selectively 'cherry-pick' critical ones to
|
||||||
|
be included into the RC. As the RC changes, new ones are made available for the
|
||||||
|
community to test and review.
|
||||||
|
|
||||||
|
This period lasts for three weeks.
|
||||||
|
|
||||||
|
## How to maximize chances of being merged before the freeze date?
|
||||||
|
|
||||||
|
First of all, there is never a guarantee that a specific changeset is going to
|
||||||
|
be merged. However there are different actions to follow to maximize the chances
|
||||||
|
for a changeset to be merged:
|
||||||
|
|
||||||
|
- The team gives priority to review the PRs aligned with the Roadmap (usually
|
||||||
|
defined by a ROADMAP.md file at the root of the repository).
|
||||||
|
- The earlier a PR is opened, the more time the maintainers have to review. For
|
||||||
|
example, if a PR is opened the day before the freeze date, it’s very unlikely
|
||||||
|
that it will be merged for the release.
|
||||||
|
- Constant communication with the maintainers (mailing-list, IRC, Github issues,
|
||||||
|
etc.) allows to get early feedback on the design before getting into the
|
||||||
|
implementation, which usually reduces the time needed to discuss a changeset.
|
||||||
|
- If the code is commented, fully tested and by extension follows every single
|
||||||
|
rules defined by the [CONTRIBUTING guide](
|
||||||
|
https://github.com/docker/docker/blob/master/CONTRIBUTING.md), this will help
|
||||||
|
the maintainers by speeding up the review.
|
||||||
|
|
||||||
|
## The release
|
||||||
|
|
||||||
|
At the end of the freeze (nine weeks after the start of the cycle), all the
|
||||||
|
projects are released together.
|
||||||
|
|
||||||
|
```
|
||||||
|
Codebase Release
|
||||||
|
Start of is frozen (end of the
|
||||||
|
the Cycle (7th week) 9th week)
|
||||||
|
+---------------------------------------+---------------------+
|
||||||
|
| | |
|
||||||
|
| Development phase | Freeze phase |
|
||||||
|
| | |
|
||||||
|
+---------------------------------------+---------------------+
|
||||||
|
6 weeks 3 weeks
|
||||||
|
<---------------------------------------><-------------------->
|
||||||
|
```
|
||||||
|
|
||||||
|
## Exceptions
|
||||||
|
|
||||||
|
If a critical issue is found at the end of the freeze period and more time is
|
||||||
|
needed to address it, the release will be pushed back. When a release gets
|
||||||
|
pushed back, the next release cycle gets delayed as well.
|