moves ensure-frozen-images to go
moves ensure-syscall-test to go
moves ensure-nnp-test to go
moves ensure-httpserver to go
Also makes some of the fixtures load only for the required tests.
This makes sure that fixtures that won't be needed for a test run such as
`make TESTFLAGS='-check.f Swarm' test-integration-cli` (for example)
aren't loaded... like the syscall tests.
Signed-off-by: Brian Goff <cpuguy83@gmail.com>
Moved a defer up to a better spot.
Fixed TestUntarPathWithInvalidDest to actually fail for the right reason
Closes#18170
Signed-off-by: Doug Davis <dug@us.ibm.com>