1
0
Fork 0
mirror of https://github.com/moby/moby.git synced 2022-11-09 12:21:53 -05:00
Commit graph

3 commits

Author SHA1 Message Date
Madhu Venugopal
1aa88fa870 Allow endpoint delete if sandbox identifier is stale
There are cases as seen in https://github.com/docker/docker/issues/17984
the sandbox could be stale in endpoint structure, when the actual
sandbox is removed during the cleanup phase. Hence instead of just
validating for sandboxID, make sure if it is actually present in the
sandboxes DB managed by the controller.

Signed-off-by: Madhu Venugopal <madhu@docker.com>
2015-11-17 21:00:46 -08:00
Jana Radhakrishnan
a22ce0938c Add bridge network integration tests
Add a few bridge network integration tests which
specifically deals with multiple bridge networks
and libnetwork restart and persistence

Signed-off-by: Jana Radhakrishnan <mrjana@docker.com>
2015-10-06 14:16:26 -07:00
Jana Radhakrishnan
f33a362b48 Introduce multi-node integration tests
- Create a wrapper script to run intergation tests
      so that setups and teardowns happen in more
      optimal manner
    - Add traps to cleanup containers on failure or
      user interrupt
    - Introduce basic multi-node integration tests
    - Removed default network, default driver tests
      as they may not be useful in the near future

Signed-off-by: Jana Radhakrishnan <mrjana@docker.com>
2015-09-18 22:49:28 -07:00