1
0
Fork 0
mirror of https://github.com/moby/moby.git synced 2022-11-09 12:21:53 -05:00
Commit graph

4 commits

Author SHA1 Message Date
Aaron Lehmann
7cf894ce10 Fix pulling images that contain no layers at all
The download manager assumed there was at least one layer involved in
all images. This can be false if the image is essentially a copy of
`scratch`.

Fix a nil pointer dereference that happened in this case. Add
integration tests that involve schema1 and schema2 manifests.

Fixes #21213

Signed-off-by: Aaron Lehmann <aaron.lehmann@docker.com>
2016-03-15 11:10:03 -07:00
Jay
f8d14bd4c6 Fix typo for download and upload retry messages
Signed-off-by: Jay <jay@imjching.com>
2016-03-15 00:56:19 +08:00
Aaron Lehmann
f425529e7e Move temporary download file to download descriptor scope
This will allow it to be reused between download attempts in a
subsequent commit.

Signed-off-by: Aaron Lehmann <aaron.lehmann@docker.com>
2016-02-09 14:12:28 -08:00
Aaron Lehmann
572ce80230 Improved push and pull with upload manager and download manager
This commit adds a transfer manager which deduplicates and schedules
transfers, and also an upload manager and download manager that build on
top of the transfer manager to provide high-level interfaces for uploads
and downloads. The push and pull code is modified to use these building
blocks.

Some benefits of the changes:

- Simplification of push/pull code
- Pushes can upload layers concurrently
- Failed downloads and uploads are retried after backoff delays
- Cancellation is supported, but individual transfers will only be
  cancelled if all pushes or pulls using them are cancelled.
- The distribution code is decoupled from Docker Engine packages and API
  conventions (i.e. streamformatter), which will make it easier to split
  out.

This commit also includes unit tests for the new distribution/xfer
package. The tests cover 87.8% of the statements in the package.

Signed-off-by: Aaron Lehmann <aaron.lehmann@docker.com>
2015-12-09 19:13:35 -08:00