This patch contains the fowllowing hacks:
(1) Add "--timetable-data=FILE" option for test-all
This option enables to dump timeline event
contains worker, suite, and start/end time.
(2) remove TestJIT in test_jit_debug.rb on parallel test.
it is duplicated test.
(3) move test_jit.rb and test_jit_debug.rb at first
because these two tests are bottleneck of parallel tests.
On my environment, `make test-all TESTS=-j12` reduced the total time
190 seconds -> 140 seconds.