2020-05-19 08:08:21 -04:00
## What is the GitLab engineering productivity problem to solve?
2019-12-10 07:07:55 -05:00
<!--
2020-05-19 08:08:21 -04:00
Please describe the engineering productivity problem that needs to be solved backed by charts from
2021-10-26 11:09:27 -04:00
https://about.gitlab.com/handbook/engineering/quality/engineering-productivity/#engineering-productivity-metrics.
2019-12-10 07:07:55 -05:00
-->
### Problem identification checklist
- [ ] The root cause of the problem is identified.
- [ ] The surface of the problem is as small as possible.
## What are the potential solutions?
<!--
Please provide potential solutions here. Example solutions could be:
- Dogfood a feature.
- Refactor/improve some workflow code.
- Throw more money at the problem.
Please provide pros/cons and a weight estimate for each solution.
-->
- [ ] All potential solutions are listed.
- [ ] A solution has been chosen for the first iteration: `PUT THE CHOSEN SOLUTION HERE`
## Verify that the solution has improved the situation
<!--
Ideally, looking at the charts from the first part, we should see an improvement
after the implementation is merged/deployed/released.
-->
- [ ] The solution improved the situation.
- If yes, check this box and close the issue. Well done! :tada:
2021-03-31 20:09:32 -04:00
- Otherwise, create a new "Productivity Improvement" issue. You can re-use the description from this issue, but another solution should be chosen this time.
2019-12-10 07:07:55 -05:00
/label ~"Engineering Productivity" ~meta