Update Documentation template

This commit is contained in:
Mike Lewis 2019-01-17 20:58:27 +00:00
parent 6d340e148e
commit b2c6058a49
1 changed files with 3 additions and 3 deletions

View File

@ -17,7 +17,7 @@ Closes
## Author's checklist
- [ ] Follow the [Documentation Guidelines](https://docs.gitlab.com/ee/development/documentation/) and [Style Guide](https://docs.gitlab.com/ee/development/documentation/styleguide.html).
- [ ] Link docs to and from the higher-level index page, plus other related docs, as appropriate.
- [ ] Link docs to and from the higher-level index page, plus other related docs where helpful.
- [ ] Apply the ~Documentation label and intended milestone.
- [ ] [Port the MR to EE (or backport from CE)](https://docs.gitlab.com/ee/development/documentation/index.html#cherry-picking-from-ce-to-ee): _always recommended, required when the `ee-compat-check` job fails_.
@ -27,7 +27,7 @@ All reviewers can help ensure accuracy, clarity, completeness, and adherence to
**1. Primary Reviewer**
* [ ] Review by a code reviewer or other selected expert to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.
* [ ] Review by a code reviewer or other selected colleague to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.
**2. Technical Writer**
@ -38,6 +38,6 @@ All reviewers can help ensure accuracy, clarity, completeness, and adherence to
1. [ ] Review by assigned maintainer, who can always request/require the above reviews. Maintainer's review can occur before or after a technical writer review.
2. [ ] Ensure a release milestone of the format XX.Y is set. If the freeze for that release has begun, add the label `pick into <XX.Y>` unless this change is not required for the release. In that case, simply change the milestone.
3. [ ] If EE and CE MRs exist, merge the EE MR first, then the CE MR.
4. [ ] After merging, if there has not been a technical writer review, create an issue for one with labels ~docs-review and ~Documentation, a link to this MR, and assign it to the technical writer for the [DevOps stage](https://about.gitlab.com/handbook/product/categories/#devops-stages).
4. [ ] After merging, if there has not been a technical writer review, [create an issue for one using the Doc Review template](https://gitlab.com/gitlab-org/gitlab-ce/issues/new?issue[title]=Validate%20new%20concept&issuable_template=Research%20proposal).
/label ~Documentation