@ -253,8 +253,9 @@ When a regression is found:
|
|||
1. Evaluate the priority and add a [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels-p1-p2-p3-p4)
|
||||
1. Schedule the issue in order to get it fixed as soon as possible, based on severity and priority, following these guidelines:
|
||||
- If the regression is ~S1 or ~S2, set the current milestone
|
||||
- If the regression was introduced in a RC of the current release, label with ~Deliverable
|
||||
- If the regression was introduced in the previos release, label with ~"Next Patch Release"
|
||||
- If the regression was introduced in a RC of the current release, label with ~Deliverable
|
||||
- If the regression was introduced in the previos release, label with ~"Next Patch Release"
|
||||
- If the regression is ~S3 or ~S4, it can be scheduled for later milestones
|
||||
|
||||
When a new issue is found, the fix should start as soon as possible. You can
|
||||
ping the Engineering Manager or the Product Manager for the relative area to
|
||||
|
|