Commit Graph

12 Commits

Author SHA1 Message Date
Timothy Andrew ba25e2f1ac Improve performance of the cycle analytics page.
1. These changes bring down page load time for 100 issues from more than
   a minute to about 1.5 seconds.

2. This entire commit is composed of these types of performance
   enhancements:

     - Cache relevant data in `IssueMetrics` wherever possible.
     - Cache relevant data in `MergeRequestMetrics` wherever possible.
     - Preload metrics

3. Given these improvements, we now only need to make 4 SQL calls:

    - Load all issues
    - Load all merge requests
    - Load all metrics for the issues
    - Load all metrics for the merge requests

4. A list of all the data points that are now being pre-calculated:

    a. The first time an issue is mentioned in a commit

      - In `GitPushService`, find all issues mentioned by the given commit
        using `ReferenceExtractor`. Set the `first_mentioned_in_commit_at`
        flag for each of them.

      - There seems to be a (pre-existing) bug here - files (and
        therefore commits) created using the Web CI don't have
        cross-references created, and issues are not closed even when
        the commit title is "Fixes #xx".

    b. The first time a merge request is deployed to production

      When a `Deployment` is created, find all merge requests that
      were merged in before the deployment, and set the
      `first_deployed_to_production_at` flag for each of them.

    c. The start / end time for a merge request pipeline

      Hook into the `Pipeline` state machine. When the `status` moves to
      `running`, find the merge requests whose tip commit matches the
      pipeline, and record the `latest_build_started_at` time for each
      of them. When the `status` moves to `success`, record the
      `latest_build_finished_at` time.

    d. The merge requests that close an issue

      - This was a big cause of the performance problems we were having
        with Cycle Analytics. We need to use `ReferenceExtractor` to make
        this calculation, which is slow when we have to run it on a large
        number of merge requests.

      - When a merge request is created, updated, or refreshed, find the
        issues it closes, and create an instance of
        `MergeRequestsClosingIssues`, which acts as a join model between
        merge requests and issues.

      - If a `MergeRequestsClosingIssues` instance links a merge request
        and an issue, that issue closes that merge request.

5. The `Queries` module was changed into a class, so we can cache the
   results of `issues` and `merge_requests_closing_issues` across
   various cycle analytics stages.

6. The code added in this commit is untested. Tests will be added in the
   next commit.
2016-09-15 14:53:02 +05:30
Timothy Andrew 9901c3df41 Add a JSON version of the `CycleAnalytics` page. 2016-09-08 15:03:38 +05:30
Timothy Andrew 0910868d3c Tweak cycle analytics query to match the current requirements.
- The `review` phase ends when a MR is merged, not "merged OR closed".
- The `code` phase starts when a MR is first mentioned in a commit, and
  ends when a merge request closing the issue is created.
- The `plan` phase ends when the issue first mentioned in a commit.

---

- Fix the `median` function so it sorts the incoming data points.
- A data point where `end_time` is prior to `start_time` is invalid.
2016-09-02 09:44:39 +05:30
Timothy Andrew 331080bca6 Fetch cycle analytics data for a specific date range.
1. Supported date ranges are 30 / 90 days ago. The default is 90 days
   ago.

2. All issues created before "x days ago" are filtered out, even if they
   have other related data (test runs, merge requests) within the filter
   range.
2016-08-26 16:28:20 +05:30
Timothy Andrew df6c9c33b6 Scope Cycle Analytics queries to a project 2016-08-26 16:28:20 +05:30
Timothy Andrew ebc03833f2 Allow multiple queries for each cycle analytics section.
1. Pass in an array of queries - the first to return a value will be
   used. This makes it easier to add more heuristics later.

2. Convert all queries with 'or' in the title to two separate queries.

3. Rename all `mr_` methods to `merge_request_`
2016-08-26 16:28:20 +05:30
Timothy Andrew fc92d06635 Add the "Test" cycle analytics section. 2016-08-26 16:28:20 +05:30
Timothy Andrew 3d5729a700 Add the "Production" cycle analytics section.
1. Rewrite the `Queries` module to work off a `data_point` hash, with
   `issue` and `merge_request` as keys. The "production" query needs
   both an issue and a merge request to make it's calculation, so it
   makes sense to keep things consistent and provide the same
   data (issue + merge request) for all queries.
2016-08-26 16:28:20 +05:30
Timothy Andrew d3fef0fb18 Add the "Staging" cycle analytics section. 2016-08-26 16:28:20 +05:30
Timothy Andrew 14d6317ebc Add the "Review" cycle analytics section. 2016-08-26 16:28:20 +05:30
Timothy Andrew 487906b386 Add the "Code" Cycle Analytics section.
1. Record the `wip_flag_first_removed_at` and
   `first_assigned_to_user_other_than_author` metrics for a merge
   request. Use a `merge_request_metrics` table, similar to the one for
   `issues`. Metrics are recorded `after_save`.

2. Move larger queries to a `CycleAnalytics::Queries` module.
2016-08-26 16:28:20 +05:30
Timothy Andrew f932bb8e41 Add the "Plan" Cycle Analytics query.
1. Move from raw SQL to ActiveRecord.
2. Add a non-persisted `CycleAnalytics` model to store all the queries.
2016-08-26 16:27:37 +05:30