Commit graph

11 commits

Author SHA1 Message Date
Dmitriy Zaporozhets
5a2ae296fa
fix observer specs
Signed-off-by: Dmitriy Zaporozhets <dmitriy.zaporozhets@gmail.com>
2013-12-10 15:43:27 +02:00
ash wilson
c8a115c0e3 Link issues from comments and automatically close them
Any mention of Issues, MergeRequests, or Commits via GitLab-flavored markdown
references in descriptions, titles, or attached Notes creates a back-reference
Note that links to the original referencer. Furthermore, pushing commits with
commit messages that match a (configurable) regexp to a project's default
branch will close any issues mentioned by GFM in the matched closing phrase.
If accepting a merge request would close any Issues in this way, a banner is
appended to the merge request's main panel to indicate this.
2013-08-25 18:58:41 -04:00
Izaak Alpert
3d7194f011 Merge Request on forked projects
The good:

 - You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
 - Push events take into account merge requests on forked projects
 - Tests around merge_actions now present, spinach, and other rspec tests
 - Satellites now clean themselves up rather then recreate

The questionable:

 - Events only know about target projects
 - Project's merge requests only hold on to MR's where they are the target
 - All operations performed in the satellite

The bad:

  -  Duplication between project's repositories and satellites (e.g. commits_between)

(for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)

Fixes:

Make test repos/satellites only create when needed
-Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
-project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
-fixed remote removal
-How to merge renders properly
-Update emails to show project/branches
-Edit MR doesn't set target branch
-Fix some failures on editing/creating merge requests, added a test
-Added back a test around merge request observer
-Clean up project_transfer_spec, Remove duplicate enable/disable observers
-Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
-Signifant speed ups for tests
-Update formatting ordering in notes_on_merge_requests
-Remove wiki schema update
Fixes for search/search results
-Search results was using by_project for a list of projects, updated this to use in_projects
-updated search results to reference the correct (target) project
-udpated search results to print both sides of the merge request

Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8
2013-07-17 22:41:30 -04:00
Dmitriy Zaporozhets
001f3bc59e Specs refactoring to reduce test time. Disabled observers by default for specs 2013-04-10 23:28:42 +03:00
Dmitriy Zaporozhets
c7bd99b040 refactor issue observer spec 2013-03-26 14:41:57 +02:00
Andrew8xx8
1644117a1a Issue uses StateMachine now 2013-02-18 14:43:50 +04:00
Dmitriy Zaporozhets
9773ccc451 sidekiq with green tests 2013-01-09 09:14:05 +03:00
Dmitriy Zaporozhets
b510f8c496 Fixed tests 2012-12-21 13:37:44 +02:00
Vincent Bonmalais
80fb38de7a Remove backward compatibility of factories. 2012-11-13 22:27:45 +11:00
Alex Denisov
2cb0a62f7d Notification sends to issue author and assignee if issue being reopened or closed 2012-08-29 10:48:17 +03:00
Robert Speicher
852b9c28dd Move observer specs out of spec/models into spec/observers 2012-08-25 13:22:45 -04:00
Renamed from spec/models/issue_observer_spec.rb (Browse further)