Commit graph

9 commits

Author SHA1 Message Date
Dmitriy Zaporozhets
c227aa44f9
Make changes to tests
* project_with_code -> project
* project -> ermpty_project

Signed-off-by: Dmitriy Zaporozhets <dmitriy.zaporozhets@gmail.com>
2014-01-22 21:03:52 +02:00
Hiroyuki Sato
df9cbbc924 Drop support of root namespace in routing 2013-09-13 07:00:24 +09:00
Izaak Alpert
3d7194f011 Merge Request on forked projects
The good:

 - You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
 - Push events take into account merge requests on forked projects
 - Tests around merge_actions now present, spinach, and other rspec tests
 - Satellites now clean themselves up rather then recreate

The questionable:

 - Events only know about target projects
 - Project's merge requests only hold on to MR's where they are the target
 - All operations performed in the satellite

The bad:

  -  Duplication between project's repositories and satellites (e.g. commits_between)

(for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)

Fixes:

Make test repos/satellites only create when needed
-Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
-project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
-fixed remote removal
-How to merge renders properly
-Update emails to show project/branches
-Edit MR doesn't set target branch
-Fix some failures on editing/creating merge requests, added a test
-Added back a test around merge request observer
-Clean up project_transfer_spec, Remove duplicate enable/disable observers
-Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
-Signifant speed ups for tests
-Update formatting ordering in notes_on_merge_requests
-Remove wiki schema update
Fixes for search/search results
-Search results was using by_project for a list of projects, updated this to use in_projects
-updated search results to reference the correct (target) project
-udpated search results to print both sides of the merge request

Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8
2013-07-17 22:41:30 -04:00
Dmitriy Zaporozhets
40bca5246b Fix routing/controller specs for refactored controllers 2013-06-23 20:25:06 +03:00
Dmitriy Zaporozhets
f5dec306fd Use project_with_code factory where necessary 2013-04-01 18:16:08 +03:00
Sato Hiroyuki
6224ac0647 Add and fix some tests for routing.
It is linked to #2598.
2013-03-06 16:36:01 +09:00
Dmitriy Zaporozhets
afbdbb0c95 Rspec fixes 2013-01-04 18:50:31 +02:00
Dmitriy Zaporozhets
0e1635a68a Fixing requests after namespaces. Fixed admin bug with access to project 2012-11-23 22:25:28 +02:00
Robert Speicher
1799cf3b49 Add CommitsController spec to make sure atom feeds work 2012-09-26 16:32:25 -04:00