Any mention of Issues, MergeRequests, or Commits via GitLab-flavored markdown
references in descriptions, titles, or attached Notes creates a back-reference
Note that links to the original referencer. Furthermore, pushing commits with
commit messages that match a (configurable) regexp to a project's default
branch will close any issues mentioned by GFM in the matched closing phrase.
If accepting a merge request would close any Issues in this way, a banner is
appended to the merge request's main panel to indicate this.
-Fixed tests to account for this
-Trigger update after update_branches for list:update selecting first commit, have it also trigger sha lookup
Change-Id: Ie4c3d4fbf57aeadd7d141d3704f4ea0f0684a7a5
-Some changes around calling origional methods for !for_fork? merge requests. Other changes to follow
Change-Id: I009c716ce2475b9efa3fd07aee9215fca7a1c150
-The forked merge request test now tests it's componenets again, and seems to work every time (did this by reordering the branch updates so their is more time for update_branches to run) -- this could still technically fail, but after several runs it doesn't seem to.
-Removed todo in merge_request, pushed wrapping of grit down to the satellite
-updated action test to check flock status, made it nolonger pending
-moved all logging on failure to helper method in satellite
GITLAB-592
Change-Id: If0554ca35eedc3d3e8461f7d93d4b3939fa2cd75
-Disable observers post test run
-Allow db:seed_fu RAILS_ENV=test to be run more than once without error
-fix diffs_in_between, was passing in the default_options for grit, but grit in this case doesn't take options, fixed the test to actually fail if the incorrect diffs are returned
-make notes/commits render against proper project
-MR discussion file links should reference note's project
-Added tests for commit links on edit merge request
-fixes edit issues (canceling an edited mr, updating an edited mr)
-updates tests with checks for source code updates
-still forked_merge_requests.feature (project_forked_merge_requests) test not passing (commented out -- "stable" not being set)
MR API: error on bad target_project
-If the target project id is specified and it is not the same as the project the request is being made on (the source), and the it isn't a fork of that project, error out, otherwise use it as the target
-Fixes some busted (but hidden) test cases
Conflicts:
app/views/merge_requests/show/_diffs.html.haml
spec/features/notes_on_merge_requests_spec.rb
Change-Id: I20e595c156d0e8a63048baaead7be6330c738a05
The good:
- You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
- Push events take into account merge requests on forked projects
- Tests around merge_actions now present, spinach, and other rspec tests
- Satellites now clean themselves up rather then recreate
The questionable:
- Events only know about target projects
- Project's merge requests only hold on to MR's where they are the target
- All operations performed in the satellite
The bad:
- Duplication between project's repositories and satellites (e.g. commits_between)
(for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)
Fixes:
Make test repos/satellites only create when needed
-Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
-project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
-fixed remote removal
-How to merge renders properly
-Update emails to show project/branches
-Edit MR doesn't set target branch
-Fix some failures on editing/creating merge requests, added a test
-Added back a test around merge request observer
-Clean up project_transfer_spec, Remove duplicate enable/disable observers
-Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
-Signifant speed ups for tests
-Update formatting ordering in notes_on_merge_requests
-Remove wiki schema update
Fixes for search/search results
-Search results was using by_project for a list of projects, updated this to use in_projects
-updated search results to reference the correct (target) project
-udpated search results to print both sides of the merge request
Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8
Created tests and refactored some code along the way
Added stat graph util spec, refactored code
finsihed up tests and refactors
finsihed up tests and refactors
It returns "yes" if required version is "1.7.10" and current version is "1.6.10",
because the patch version of current version equals to that of required version.