Commit graph

16 commits

Author SHA1 Message Date
Vinnie Okada
76aad9b76e Upgrade to Rails 4.1.9
Make the following changes to deal with new behavior in Rails 4.1.2:

* Use nested resources to avoid slashes in arguments to path helpers.
2015-02-14 11:09:23 -07:00
Jeroen van Baarsen
940a402b6e Fixed hound warnings
Signed-off-by: Jeroen van Baarsen <jeroenvanbaarsen@gmail.com>
2015-02-12 19:32:58 +01:00
Jeroen van Baarsen
0c4a70a306 Updated rspec to rspec 3.x syntax
Signed-off-by: Jeroen van Baarsen <jeroenvanbaarsen@gmail.com>
2015-02-12 19:17:35 +01:00
Dmitriy Zaporozhets
b954f24420
Fix MR controller tests
Signed-off-by: Dmitriy Zaporozhets <dmitriy.zaporozhets@gmail.com>
2014-08-06 09:07:11 +03:00
Dmitriy Zaporozhets
c227aa44f9
Make changes to tests
* project_with_code -> project
* project -> ermpty_project

Signed-off-by: Dmitriy Zaporozhets <dmitriy.zaporozhets@gmail.com>
2014-01-22 21:03:52 +02:00
Dmitriy Zaporozhets
09d5868c22
Fix mr controller specs
Signed-off-by: Dmitriy Zaporozhets <dmitriy.zaporozhets@gmail.com>
2014-01-14 10:47:28 +02:00
Hiroyuki Sato
df9cbbc924 Drop support of root namespace in routing 2013-09-13 07:00:24 +09:00
Dmitriy Zaporozhets
a73e068c06 Fixing tests after adding iid for issues/mr 2013-08-20 16:56:05 +03:00
Izaak Alpert
3d7194f011 Merge Request on forked projects
The good:

 - You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
 - Push events take into account merge requests on forked projects
 - Tests around merge_actions now present, spinach, and other rspec tests
 - Satellites now clean themselves up rather then recreate

The questionable:

 - Events only know about target projects
 - Project's merge requests only hold on to MR's where they are the target
 - All operations performed in the satellite

The bad:

  -  Duplication between project's repositories and satellites (e.g. commits_between)

(for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)

Fixes:

Make test repos/satellites only create when needed
-Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
-project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
-fixed remote removal
-How to merge renders properly
-Update emails to show project/branches
-Edit MR doesn't set target branch
-Fix some failures on editing/creating merge requests, added a test
-Added back a test around merge request observer
-Clean up project_transfer_spec, Remove duplicate enable/disable observers
-Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
-Signifant speed ups for tests
-Update formatting ordering in notes_on_merge_requests
-Remove wiki schema update
Fixes for search/search results
-Search results was using by_project for a list of projects, updated this to use in_projects
-updated search results to reference the correct (target) project
-udpated search results to print both sides of the merge request

Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8
2013-07-17 22:41:30 -04:00
Dmitriy Zaporozhets
40bca5246b Fix routing/controller specs for refactored controllers 2013-06-23 20:25:06 +03:00
Douglas Huff
de6db60477 Fix overlapping test case names. 2013-04-07 13:58:25 -07:00
Dmitriy Zaporozhets
f5dec306fd Use project_with_code factory where necessary 2013-04-01 18:16:08 +03:00
Dmitriy Zaporozhets
fd522b3257 should be green build now :) 2013-01-15 19:18:52 +02:00
Dmitriy Zaporozhets
afbdbb0c95 Rspec fixes 2013-01-04 18:50:31 +02:00
Dmitriy Zaporozhets
a4e6ab0a29 Fixing and commenting tests 2012-11-26 14:44:29 +02:00
Riyad Preukschas
267b18dead Add specs for exporting merge requests as diff or patch 2012-11-25 00:06:53 +01:00