255dbb3228
1. EE access control specs are significantly different, so this is a way to reduce potential merge conflicts. EE and CE specs go in separate files. |
||
---|---|---|
.. | ||
access_control_ce_spec.rb |
255dbb3228
1. EE access control specs are significantly different, so this is a way to reduce potential merge conflicts. EE and CE specs go in separate files. |
||
---|---|---|
.. | ||
access_control_ce_spec.rb |