gitlab-org--gitlab-foss/doc/user/project/bulk_editing.md

64 lines
2.4 KiB
Markdown

---
stage: Plan
group: Project Management
info: To determine the technical writer assigned to the Stage/Group associated with this page, see https://about.gitlab.com/handbook/engineering/ux/technical-writing/#designated-technical-writers
---
# Bulk editing issues and merge requests at the project level
NOTE: **Note:**
Bulk editing issues, epics, and merge requests is also available at the **group level**.
For more details, see
[Bulk editing issues, epics, and merge requests at the group level](../group/bulk_editing/index.md).
If you want to update attributes across multiple issues or merge requests, you can do it
by bulk editing them, that is, editing them together.
![Bulk editing](img/bulk-editing_v13_2.png)
## Bulk edit issues at the project level
NOTE: **Note:**
You need a permission level of [Reporter or higher](../permissions.md) to manage issues.
When bulk editing issues in a project, you can edit the following attributes:
- Status (open/closed)
- Assignee
- Epic ([introduced](https://gitlab.com/gitlab-org/gitlab/-/issues/210470) in
[GitLab Premium](https://about.gitlab.com/pricing/) 13.2.) **(PREMIUM)**
- Milestone
- Labels
- Health status ([introduced](https://gitlab.com/gitlab-org/gitlab/-/issues/218395) in
[GitLab Ultimate](https://about.gitlab.com/pricing/) 13.2.) **(ULTIMATE)**
- Subscriptions
To update multiple project issues at the same time:
1. In a project, go to **{issues}** **Issues > List**.
1. Click **Edit issues**. A sidebar on the right-hand side of your screen appears with editable fields.
1. Select the checkboxes next to each issue you want to edit.
1. Select the appropriate fields and their values from the sidebar.
1. Click **Update all**.
## Bulk edit merge requests at the project level
NOTE: **Note:**
You need a permission level of [Developer or higher](../permissions.md) to manage merge requests.
When bulk editing merge requests in a project, you can edit the following attributes:
- Status (open/closed)
- Assignee
- Milestone
- Labels
- Subscriptions
To update multiple project merge requests at the same time:
1. In a project, go to **{merge-request}** **Merge Requests**.
1. Click **Edit merge requests**. A sidebar on the right-hand side of your screen appears with
editable fields.
1. Select the checkboxes next to each merge request you want to edit.
1. Select the appropriate fields and their values from the sidebar.
1. Click **Update all**.